MI-15-18: Cook Road Bridge No. C35-0.91 Replacement

Cook Road Bridge Replacement


Cook Road Bridge No. C35-0.91 Replacement – MI-15-18


Contact: Doug Royer, Deputy Engineer (732-8885)


History of Project: The existing bridge is 21-foot span bridge with a rating appraisal of 4.  The proposed bridge will be a cast in place 4-sided concrete box.  OPWC funding was secured for this bridge in July 2021 and the project is now ready to proceed to public bidding.


Costs: The estimated construction cost is $477,300.00.  This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds.


Time Period: The completion date for this project is set at November 1, 2024


Project Documents:

Legal Notice – PDF

Bid Results – PDF


Project Status:

Under Construction