Return to the home page
Click here to visit the Clermont County, Ohio Portal
Navigation
  • Home
  • News and Highlights
  • Road Closures
  • About the Engineer
  • Contact Us
  • Construction
    • 2012 Projects
    • Completed Projects
      • Cole Road Landslide
      • Taylor Pike Bridge Replacements
      • Old 52 Bridge C303-0.29 Replacement
      • Old 74 College Drive
      • Clermontville Laurel Landslide
      • Elmwood Bridge T120-0.32 Replacement
      • Bach Buxton Road at Ferris-Midland
      • Old SR 32 Bridge # C351-2.80, Bridge Replacement
      • Old State Route 32 and Bauer Road - Roadway Improvement
      • Hopper Hill Landslide
      • Ninemile Landslide
      • Jenny Lind Landslide
    • Future Projects
    • Road Resurfacing
  • Planning and Design
  • Permit Applications
  • Highway Operations
  • Surveying
  • FAQs
Clermont County, Ohio

Old 52 Bridge C303-0.29 Replacement

Bridge Replacement for the Old State Route 52 Bridge (C303-0.29) over Ninemile Creek. The Old State Route 52 Bridge is currently posted at 12 tons. 
The structure is deteriorated and needs replaced.

Contact:  Todd C. Gadbury, Bridge Engineer (732-8865)                                                                              
Purpose/Need: This project will replace the bridge over Ninemile Creek, bridge # C303-0.29, located in the Pierce Township. 

Action Necessary: Advertisement of Legal notice for three consecutive weeks to obtain bids for the bridge replacement.
    
History of Project: This is an LPA project funded 80% thru Federal Funds and the remaining 20% will be paid by the Clermont County Engineer’s Office.  The LPA agreement was previously ratified by the Board of Clermont County Commissioners on May 11, 2005, resolution # 80-05.  The PID# for this project is 79070.  This project will be using federal wage rates (Davis Bacon).

Costs: The construction costs are estimated at $ 600,000.00 of which $480,000.00 is Federal Funds and the remaining $120,000.00 will be paid by the Clermont County Engineer’s Office.

Expected Outcomes: Improved width and unrestricted weight limit.

Time Period: This project is scheduled to be completed in the Fall of 2011.

  • Bid Results

  • Bidders List

  • Legal notice to Contractors

  • Existing Bridge Photos

  • Location Map