Failure of existing retaining wall, which resulted in a failure of the slope. The slip has caused the roadways pavement to be uneven.
Contact: Todd C. Gadbury PE, Bridge Engineer (732-8865)
Purpose/Need: This project will repair existing landslide located in Pierce Township.
Action Necessary: Advertisement of Legal notice to obtain bids for this project.
History of Project: A drilled pier retaining wall has been designed to reinforce the slope at the project location. OPWC funds will be used for the construction of both landslides.
Costs: The construction cost for the two landslides is estimated to be $385,000.00. OPWC Project CJ17N will reimburse 79% of Engineering and Construction costs.
Expected Outcomes: Repair of the existing landslides on Hopper Hill Road using reinforced concrete piers.
Time Period: Landslide Stabilizations will be completed 120 days after the notice to proceed.
Responsible Department(s): County Engineers Office.